中文字幕不卡在线中文字幕av在线日韩|国产成人精品久久久人妻中文字幕高清|欧美日韩一区二区精品|精东影业电影|江苏极品白嫩少妇91|欧美日韩在线中文字幕|久久久久成人精品亚洲国产|国产欧美日韩一区二区三区精品|91精品高清|国产精品一级黄色片,xk8135星空传媒99精品国产精品一区二区,亚洲精品熟女乱色一区,91久久亚洲综合

歡迎進(jìn)入濟(jì)南長(zhǎng)久機(jī)械設(shè)備制造有限公司網(wǎng)站!
熱門關(guān)鍵詞:導(dǎo)軌式升降機(jī)、液壓升降貨梯,、固定剪叉式升降平臺(tái),、家用電梯、全自行式升降機(jī),、移動(dòng)登車橋,、固定登車橋
您的位置: 首頁(yè)>>新聞資訊 >> 升降貨梯儲(chǔ)罐簡(jiǎn)介

咨詢熱線

15910081959

升降貨梯儲(chǔ)罐簡(jiǎn)介

作者:長(zhǎng)久機(jī)械瀏覽:347 時(shí)間:2022-05-16 09:03:01

升降貨梯http://www.jntr168.com/安裝儲(chǔ)罐的基礎(chǔ)要求平整,并能承受相應(yīng)的壓力,。儲(chǔ)罐安裝設(shè)備在出廠時(shí)已安裝好了接頭,,強(qiáng)度是最佳的。但在運(yùn)輸,、裝卸時(shí)接頭可能會(huì)引起松動(dòng),,宜在安裝時(shí)對(duì)接頭密封性能進(jìn)行檢查,。
Cargo lifter installed base of the tank should be smooth, and can withstand the corresponding pressure. Tank install equipment at the factory installed the joint strength is the best. But in the transport, handling may cause loose

joints, should be in the installation of the Joints to be checked.
  
在升降貨梯先期施工的罐底板上安裝數(shù)個(gè)固定墊墩,然后組裝第一層壁板和頂蓋板,,沿罐內(nèi)壁400mm處均布數(shù)臺(tái)液壓提升機(jī),,以提升機(jī)的滑動(dòng)托架托住固定在罐內(nèi)壁的脹圈下部,操縱液壓提升機(jī)的控制距,。
Pre-installed on a cargo lifter construction of the tank floor mat several fixed pier, then assembled the first layer of wall and roof panels, along the tank wall at a uniform number of 400mm hydraulic hoist to lift up the machine to enhance the sliding bracket fixed in the lower part of the tank wall expansion ring, hydraulic steering control from the hoist.

 升降貨梯http://www.jntr168.com/在使用過程中需要檢查安裝盲板,,盲板要安裝在最靠近儲(chǔ)罐的法蘭處。盲板要安裝在截止閥最適合進(jìn)行試壓的一側(cè),,盲板兩側(cè)應(yīng)安裝密封墊圈,,按照需要至少在盲板的受壓一側(cè)要加密封墊圈。工作人員能否到達(dá)所選擇的 儲(chǔ)罐安裝設(shè)備盲板安裝位置,,是否制定了消除或減少跑冒滴漏,、防止污染的有關(guān)規(guī)定。盲板是否安裝在最靠近設(shè)備,、儲(chǔ)罐或容器的法蘭處,。對(duì)升降貨梯儲(chǔ)罐檢修時(shí),如需現(xiàn)場(chǎng)射線探傷時(shí),,應(yīng)隔離出透照區(qū),,設(shè)置安全標(biāo)志。
Cargo lifter in the course you need to check the installation Blind, blind flange to be installed closest to the tank. Blind side of the shut-off valve must be installed in the most suitable for the pressure test, should be installed on both sides of the blind plate gasket, according to at least one side of the blind in the pressure plate to add gasket. Staff can reach the selected tank installations Blind installation location, whether formulated to eliminate or reduce leaking, to prevent contamination of the relevant provisions. Blind flange plate is installed in the closest device, tank or vessel. When cargo lifter tank for maintenance, while for site-ray detection, should isolate the transillumination area, set up safety signs.

返回列表 本文標(biāo)簽:
全國(guó)免費(fèi)服務(wù)電話 159-1008-1959
地址:濟(jì)南市濟(jì)陽區(qū)濟(jì)陽街道工業(yè)園15-4號(hào) 手機(jī):王經(jīng)理    電話:159-1008-1959 郵箱:2984124925@qq.com
微信二維碼

掃一掃關(guān)注
微信二維碼